Low MOQ clothing manufacturer
Clothing production from 50 to 100 units per style.
We are the factory. Small first runs get the same cutting tables, sewing lines and inspection as large ones, so you can test a product without buying a container of it.
- Minimum order
- 50 to 100 units per style
- Bulk production
- 25 to 30 calendar days
- DDP shipping
- 10 to 15 calendar days, customs cleared
How a small order runs, in six steps
- 1
Send your design
A sketch, photo, AI render or full tech pack. Upload it below or email it to us.
- 2
Tech pack
No tech pack yet? Our design team develops one with you before we cut a single sample.
- 3
Paid sample
We cut and sew a sample from your tech pack so you can check fit, fabric and finish before bulk.
- 4
Bulk production
Once you approve the sample, mass production takes 25 to 30 calendar days.
- 5
Final QC at our warehouse
Every order is checked at our warehouse before it leaves.
- 6
DDP delivery to your door
10 to 15 calendar days DDP delivery to your door, customs cleared. You do not deal with customs.
Timeline in calendar days
| Stage | Time |
|---|---|
| Bulk production | 25 to 30 calendar days |
| DDP shipping | 10 to 15 calendar days |
Development and sampling time depends on the garment and is confirmed with your quote.
Not only basics
Low minimums usually mean plain tees. Ours cover structured garments too.
Certified production
- OEKO TEX
- BSCI
- SEDEX
- ISO 9001
- GOTS
- GRS
- WRAP
Certificates available on request.
OEKO TEX, BSCI, SEDEX, ISO 9001, GOTS, GRS, WRAPDrop your design
Tell us the product and quantity. We reply with a quote from sales@innovtex.com.
Questions about small orders
What is your minimum order?
MOQs start at 50 to 100 units per style, depending on category and fabric. Simple basics sit at the lower end; tailored or technical pieces at the higher end. Your quote confirms the exact figure.
Do you ship DDP to the US, UK, EU and Australia?
Yes. We deliver DDP to the US, UK, EU and Australia, customs cleared, straight to your door.
Who handles customs and duties?
We do. Under DDP the duties and clearance are handled before the goods reach you.
Can you produce labels, hangtags and packaging?
Yes. Woven labels, care labels, hangtags and branded packaging can be produced with your order.
Do I need a tech pack?
No. Send a sketch, photo or AI design. If you need one, our design team can develop the tech pack for you.
How long does a first order take end to end?
After sample approval: 25 to 30 calendar days, then 10 to 15 calendar days DDP delivery to your door, customs cleared. Development and sampling time depends on the garment.
What files do I need to send for a quote?
Your design or reference images, quantity per style and colour, size range, fabric preference, target price if you have one, and the delivery country.
Are you a sourcing agent?
No. Innovtex is the manufacturer, producing across 4 countries: China, Spain, Vietnam and Honduras, with headquarters in Barcelona, Spain and China.
Planning a first collection? Read the tech pack tools guide.